PDF Print E-mail

Getting Your Project to a Good Start

tower

Waldrop Construction has been building relationships for over sixty years. During this time, we've pioneered the different ways of contracting, from Hard Bidding projects,to Design-Build, Construction Manger Agent, and Construction Manager-at-Risk. Over the last decade, most of our Clients choose Construction Management at Risk as the preferred method of building.

Why Construction Management at Risk?

Construction Management at Risk is about Personalization. You get to control how much involvement you want in the Design, Bidding, and Construction Phase.

Would you like your Builder to work with you and the Architect, while you are designing the project, to help create better budgets and schedules?

  • We do that, at little or no cost to you.

How about having a Construction Professional available to show your School Board, or other Organizations, how the project can be built, and be prepared for the hard questions, at any point in Design?

  • As Construction Managers, we show real world, first hand examples of
    how any problems you forsee can be solved.

Would you like to take a part in the bid process?

  • We require that a representative from your school, and the Architect, be
    present at our 'Bid Room' during the bid opening, to assure everyone

    that we get great bid coverage, with the highest ethical standards,
    correctly, in a timely manner.

Managing Risks

Are we required to award subcontracts to lowest bidder, or is there a way to
give preference to local businesses?

  • You are given great flexibility with Construction Management at Risk. If
    you feel that you are given greater value by using a local, yet slightly higher
    priced subcontractor, the State of Texas has empowered you to make
    that decision. We can also say "no thanks" to subcontractors who show a
    history of poor performance, or appear to be a "high risk" candidate for
    employment.

Openness and Transparency

  • Under Construction Management, the Accounting for your project is
    available for auditing, down to the last penny.

These are just a few of the reasons why Construction Management at Risk,
using Waldrop Construction, is the building method of choice for so many School
Districts. Please call us to talk about how we can help your Project
off to a great start today.

Read on at When to Hire the Construction Manager